Modular homes: permits and design in 2026

A modular home needs a permit like any other house. Find out what has changed under the RJUE since October and what to check before ordering.

Edgar Gonçalves

By Edgar Gonçalves, Architect · CEO and co-founder · Published on this site on

Enlarge image

There is a very common misconception about modular homes: because the house arrives ready-made from the factory, the local council does not need to get involved. That is not the case. Permits for modular homes follow the same rules as those for masonry-built houses, as DECO PROteste reiterated back in August: whether modular, timber-built or made from shipping containers, construction without prior planning control is illegal.

The subject has come back into focus in recent weeks. The November/December issue of Edifícios e Energia magazine devotes one of its cover stories to modular construction and the importance of design for energy efficiency. And since 1 October, new rules under the Legal Framework for Urban Development and Building (RJUE) have applied. For anyone thinking of buying a modular home, this changes some deadlines and procedures. It does not change the essential point: the plot and the design still determine whether the house can be installed.

Permits for modular homes: what the law says

For the local council, a modular home intended for residential use is a building project. It must comply with the Municipal Master Plan (PDM), building regulations and any easements or restrictions affecting the plot. The fact that the modules come from a factory changes none of this, nor does it remove the need for an architectural design or specialist engineering designs covering structures, water supply and drainage, electricity, thermal performance and other areas.

The consequences of proceeding without authorisation are the same as for any illegal building work. The council can issue a stop-work order, and the house may have to be legalised or demolished. According to DECO, carrying out development without a permit, prior notification or prior planning information carries fines of €500 to €200,000 for individuals and €1,500 to €450,000 for companies.

The house is also subject to Municipal Property Tax (IMI), so it must be registered with the tax authority and have a property tax record. A house that "does not exist" for the council is unlikely to exist for a bank or a future buyer either.

Before ordering: the plot comes first

One costly mistake is choosing the model first and the plot afterwards. Before signing with a supplier, you should establish:

  • what the PDM allows on that plot (use, floor area, height and setbacks);
  • whether the plot lies within the National Agricultural Reserve (RAN) or National Ecological Reserve (REN), or is subject to other easements or restrictions;
  • whether it forms part of a subdivision or a detailed plan with parameters already set;
  • whether there is access, mains water, sewerage and electricity, or whether these will need to be arranged.

A modular home from a catalogue was designed for a generic plot. Often it will fit yours; sometimes its positioning, orientation, levels or number of modules will need adjusting. This is where architectural design comes in—not after the house has been paid for. If you are still unsure about the plot, you can ask us for a plot and PDM assessment before proceeding.

Requests for prior planning information now carry more weight

A request for prior planning information (PIP) remains optional, but the revision of the RJUE has given it greater weight. According to ECO's explainer on the new rules, there are two types:

A simple PIP establishes whether the proposed development is feasible and which rules apply. The council has 15 days to decide, and a favourable response binds it when considering the subsequent application.

A full PIP already includes building massing, the architectural design, the proposed uses, infrastructure and an estimate of charges. The council has 30 days. If its response is favourable and covers all elements, the work is exempt from both a permit and prior notification, provided it is carried out exactly as assessed. Details of charges, specialist engineering designs and declarations of responsibility must still be submitted before work begins, and construction must start within two years.

For a modular home, a full PIP has a practical advantage: it provides certainty about the plot before the factory starts production.

Permits or prior notification after October

Decree-Law No. 108/2026 was due to take effect on 3 August but was postponed until 1 October. It applies to applications initiated from that date and to those still undergoing completeness checks and preliminary assessment.

Prior notification becomes the mandatory route when the project's parameters are already set by a subdivision, a detailed plan or an implementation unit: building footprint, height, number of storeys and dwellings, floor area and uses. It may also apply in established urban areas if the design complies with the plan, does not exceed the prevailing façade height along the built frontage and does not require land to be ceded to the municipality. Where the law requires prior notification, applying for a permit is no longer an option.

In practice, a modular home on a plot within a recent subdivision will tend to follow the prior notification route. On an isolated plot outside these circumstances, a permit is the more likely requirement.

Prior notification is not approval

With prior notification, work can begin without waiting for a council decision, provided the submission is complete, the fees have been paid and the council has been notified at least five days before work starts. The council has not approved anything; it has merely received the submission. If it later identifies substantive non-compliance, it can declare the notification invalid and order compliance to be restored, which in an extreme case means demolition.

Responsibility shifts to the developer and the professionals who sign the declarations of responsibility. With a modular home, you should confirm who signs what: the supplier's designer, an architect you appoint, or both. If there is an error in the building's positioning, that is where accountability will lie.

Deadlines when a permit is required

Under the permit procedure, the council has 20 days for completeness checks and preliminary assessment, generally 30 days to decide on the architectural design, and 20 days for the final decision on building works. If it does not respond in time, approval or consent is deemed to have been granted. These deadlines apply to individual stages. The whole process takes longer because it includes revisions, external opinions and the submission of specialist engineering designs.

Assembly, occupancy and financing

Once construction is complete, use of the house depends on a prior notification accompanied by a declaration of responsibility certifying that the work complies with the approved design. The family can move in as soon as the notification is submitted with all the required documents. Whoever signs is accountable for their declaration, so supervision of the assembly matters just as much as the design.

As for financing, DECO explains that banks assess applications case by case, considering the durability and quality of construction and whether the house is movable. A house that can be relocated is unlikely to be accepted as security for a mortgage. The alternative, a personal loan, comes with higher interest rates and shorter repayment terms. Before accepting a manufacturer's promise of "100% financing", check which bank is behind it and what the annual percentage rate of charge (APR) is.

Some suppliers include the permit process in their price; others charge separately. Check whether the quotation includes an architectural design adapted to your plot, all specialist engineering designs, energy certification, foundations and utility connections. If the catalogue price covers only the modules, the final bill could be very different. For an idea of the total investment involved in building a house, our article on how much it costs to build a house in Portugal explains what the price per square metre leaves out.

Where the architecture practice comes in

A well-designed modular home is a house conceived for its particular plot: solar orientation, levels, access, what the PDM permits and what the council will require. At Escala Absoluta, we handle the architectural design, specialist engineering designs and permit process, and monitor construction when the client requests it. If you have already chosen a supplier, we can adapt the design to your plot and manage the council application. Our guide to a project with us sets out the stages.

If you own a plot and are considering a modular home, talk to us before signing the order. An initial assessment of the plot costs far less than modules that cannot be installed.